May 2007 Archives

Starting Friday, May 25, 2007 at 6:00 PM and ending Saturday, May 26, at 6:00 PM.

As part of updating infrastructure and wiring for central telephone services, NTS will be removing old wires and reconnecting them to new infrastructure. All classroom telephones in the buildings listed below will be out of service and will not have dial tone for the duration of this project. Voicemail service will be available without interruption. Telephones will automatically roll to the voice mail system and messages can be left. Ethernet connections will not be affected.

The Classroom Support Hotline will not be affected by the outage and will remain in service.

Buildings affected by this outage:
Akerman, Architecture, Armory, Bell Museum, Civil Engineering, Church Street Garage, Fieldhouse, Ford Hall, Klaeber Court, Lind, Mechanical Engineering, Morrill Hall, Murphy, Nolte, Northrop, Physics, Pillsbury, Shepherd Lab, Vincent, 4th St. Ramp, 1701, EECSci (partially).
All final exams scheduled in Folwell Hall on Thursday, May 10 are being relocated.
Exams scheduled for Thursday May 10 in Follwell Hall are being moved on the same scheduled date and time as follows:

Spring 2007 Finals Relocated from Folwell Hall

Please see table below:

Course

Meeting
Time

Old
Room

New
Room

Thursday
May 10:

FolH:

 

ALL 5920 002

CHN 1012 001

CHN 4002 001

EDPA 5041 001

EDPA 5132 001

EDPA 8302 001

FREN 3014 001

FREN 3015 003

FREN 3016 004

GER 3512W 001

ITAL 1001 002

ITAL 1002 002

ITAL 1004 001

ITAL 3015 001

ITAL 4001 002

ITAL 4002 002

ITAL 4004 001

JPN 1012 001

JPN 4002 001

LING 3601 001

LING 5601 001

RUSS 1102 001

RUSS 3211 001

RUSS 5211 001

SOC 5455 001

SPAN 1004 014

SPAN 3015 003

SPAN 3107W 002

SPAN 3510 001

SPAN 3612 001

SPAN 3702 001

SPAN 3950 001

SWED 1002 001

SWED 4002 001

TRIN 4201 001


0800-1000

1330-1530

1330-1530

1640-1840

1640-1840

1325-1615

0800-1000

0800-1000

1330-1530

0800-1000

1330-1530

1330-1530

1330-1530

1330-1530

1330-1530

1330-1530

1330-1530

1330-1530

1330-1530

0800-1000

0800-1000

1330-1530

0800-1000

0800-1000

1640-1840

0800-1000

0800-1000

1330-1530

1330-1530

1330-1530

0800-1000

0800-1000

1330-1530

1330-1530

1830-2030


312

208

208

14

344

334

218

246

246

147

151

350

148

218

151

350

148

147

147

50

50

344

14

14

14

46

104

138

318

14

134

208

240

240

306


1701U 208

AkerH 309

AkerH 309

NichH 125

NichH 315

PeikH 155

NichH 145

NichH 110

1701U 109

Arch 45

1701U 206

1701U 207

NichH 325

1701U 218

1701U 206

1701U 207

NichH 325

1701U 208

1701U 208

Arch 31

Arch 31

1701U 16

NichH 115

NichH 115

NichH 125

NichH 315

1701U 16

NichH 110

1701U 14

NichH 355

1701U 109

NichH 335

1701U 3

1701U 3

NichH 120


The Office of Classroom Management (OCM) is building a future flexible classroom as a pilot project in a renovation of rooms 58/64/70 in the Biological Sciences Center on the Saint Paul campus.

The new active-learning centered classroom will demonstrate important design concepts that will be fundamental in the next generation of University of Minnesota general purpose (GP) classrooms.
These include:
- Flexibility to meet changing room size and/or pedagogy requirements
- Ability to flex forward to function as a larger SCALE-UP* classroom (capacity 117)
- Ablity to flex smaller to 2 SCALE-UP classrooms (72 and 36 capacity), or 2 traditional seating table/chair classrooms, or 1 SCALE-UP and 1 traditional classroom

The Future Flexible Classroom will include a rich technology environment using the UM Projection Capable Classroom standard system with add-on modules, including multiple fixed flat-panel display/projection systems, special laptop and system switching, and circumferential white board surfaces.

Design and construction of the Future Flexible Classroom will feature reconfigurable low-profile flooring with internal power and cable management, demountable wall systems and advanced classroom AV system control features. These key features will allow the room to be reconfigured, or flexed, on an annual basis to meet changing room size or pedagogical requirements.

This project is a concept demonstration to test room design, construction technologies and features that will be used in future University of Minnesota General Purpose Classroom construction and renovations. The flooring and wall system technologies used in this demonstration project have been successfully employed in corporate office, lab and other settings. Their use in University of Minnesota classrooms offers the potential to make sure that the inventory of instructional space keeps pace with the dynamic teaching and learning needs of faculty and students. It also helps the University optimize its investment in building and maintaining the right classrooms for our needs of today and tomorrow.

This project is a companion to the SCALE-UP GP Classroom Pilot Project being conducted in Electrical Engineering-Computer Science 2-260 on the East Bank campus.

OCM is responsible for room design, technology and construction in both projects. OCM has partnered with the Digital Media Center for faculty development and student/faculty assessment in both of the new SCALE-UP GP classroom pilots. OCM's Classroom Planner Jeremy Todd is Project Lead for the Future Flexible Classroom and SCALE-UP efforts.

The new pilot classroom will be operational in Fall semester 2007, and the College of Biological Sciences will use it for their new Foundations of Biology for Majors course.

* SCALE-UP: "Student-Centered Activities for Large Enrollment Undergraduate Program" Classroom design featuring round tables for 9 students each in a high technology, student centered classroom learning environment.