Science Teaching and Student Services Building Update

| No Comments
The cold start to 2010 has not affected the construction progress for the Science Teaching and Student Services Building (ST+SS). McGough has successfully enclosed the building, which is being warmed by two temporary heaters. All 300 panels of the glass curtain wall are installed and the strip windows on the Pleasant St. side are finished. Work on the inside of the building is proceeding on schedule.

Two of the three interior stairs are complete. The drywall work is nearly completed on level five with the other floors not too far behind. The two elevators for the building are being installed and the raised access flooring work will be starting shortly.

The metal panels are being installed on the mechanical penthouse on the roof and installation of the architectural precast base for the curtain wall will beginning shortly.


STSS update 01142010.jpg

Leave a comment