Week 4 Project total (hours scanning + quality checking) 169 hours 27006 scans
Last week was a little bumpy with students not coming in as scheduled. However, two students were able to pick up more hours which helped. The next two weeks we're
down to 2 student workers.
One student is on vacation all this week and next week.
Another student has left us. She graduated and has moved on with her work. She may be back on a weekly basis for quality checks.
Another student is also looking at other work options. She hasn't decided if she will work
at the libraries this fall.
I interviewed another new student. She'll start after Labor Day.
On top of all this, I'm at a conference for three days this week. I hope this does not slow the students down. As long as the scanner is functioning, the students can handle working independently.
I'm hoping once school starts and students get settled into their fall schedule, work flow will be more reliable than this end of summer transition.
The goal for today is to get a fall schedule out to students.