Speaking of Beck and London Underground Maps, some alternative and future visions of the London Underground

1) An alternative representation of today by Alex Gollner

2) Anticipated 2010 network (via TfL)

3) TFL 2025 Indicative Map

Interestingly, none of these include the proposed Northern Line extension to Battersea Power Station, just showing how much more dynamic reality is then plans (with a possible opening date of the extension in 2015). (map photograph here via Annie Mole.

1 Comment

Check out a discussion of the necessity of funding existing transit networks as the first priority of the next administration, and the failure of U.S. transit to keep up with foreign investments at the transport politic.

David Levinson

Network Reliability in Practice

Evolving Transportation Networks

Place and Plexus

The Transportation Experience

Access to Destinations

Assessing the Benefits and Costs of Intelligent Transportation Systems

Financing Transportation Networks

View David Levinson's profile on LinkedIn

Subscribe to RSS headline updates from:

About this Entry

This page contains a single entry by David Levinson published on October 23, 2008 8:20 PM.

Beck is Back was the previous entry in this blog.

Traffic Jam: 10 Years of "Sustainable" Transport in the UK is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Monthly Archives

Pages

Powered by Movable Type 4.31-en