New UK high-speed rail plan unveiled

From the BBC New UK high-speed rail plan unveiled

The line would serve Birmingham and Manchester, getting passengers from Glasgow to London in just two hours and 16 minutes, the rail firm said. It rejected several alternative routes, including the east of England.

Judging from the map (linked below), the architecture of the line is clearly to feed London, all of the ancillary cities are as if on a tree with the xylem and phloem oriented to London, it would not be terribly good for say Manchester to Edinburgh or Manchester to Birmingham.

"The firm said that the line would account for 43.7 million journeys per year by 2030, which would result in 3.8 million fewer vehicle journeys and fewer carbon dioxide emissions.".
In other words, more 90% of the trips are switching from rail or air to HSR. Providing better rail service to existing rail passengers is a good thing, but CO2 is hardly a rationale (as more CO2 has to be used going faster than going slower if the electricity is from the same place ... diesel to electric conversion is a separate matter).

Finally, the cost is esimated at $55B for 1500 miles of rail (presumably including triple or quadruple tracking in some sections. Planning will take 5 more years. It is hoped by the promoters the first section (London to Birmingham) will open in 2020. Speeds will max at 200 mph.


rail plan

Birmingham: 45mins, down from 1h 22mins

Liverpool: 1hr 23mins, down from 2hrs 8mins

Manchester: 1hr 6mins, down from 2hrs 7mins

Edinburgh: 2hrs 9mins, down from 4hrs 23mins

Glasgow: 2hrs 16mins, down from 4hrs 10 mins


Also see: London to Glasgow in five minutes, a video showing the West Coast Main Line (which this proposal seems to duplicate) and was recently modernized for 9 billion pounds.

David Levinson

Network Reliability in Practice

Evolving Transportation Networks

Place and Plexus

The Transportation Experience

Access to Destinations

Assessing the Benefits and Costs of Intelligent Transportation Systems

Financing Transportation Networks

View David Levinson's profile on LinkedIn

Subscribe to RSS headline updates from:

About this Entry

This page contains a single entry by David Levinson published on August 26, 2009 10:19 AM.

Open House for Franklin Ave/East River Road Intersection | Bridgeland News was the previous entry in this blog.

State Seeks Stimulus Funds to Study High-Speed Rail is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Monthly Archives

Pages

Powered by Movable Type 4.31-en