Open House for Franklin Ave/East River Road Intersection | Bridgeland News

I attended the Open House for Franklin Ave/East River Road Intersection, where the County and consultants revealed their plans. These are described in the (what I thought was defunct) Bridgeland News article.

My views are here.

In short, instead of a Monderman-esque Shared Space, or even a roundabout, they are tweaking the signal timings and reconfiguring the approach lanes. The main change there is on the Franklin Avenue bridge, which will reduce to 1 lane in each direction on the west side, and flare to two lanes at the approach. This will no doubt improve things (in terms of vehicle delay from most approaches and pedestrian delay) over the baseline, and at least it is relatively cheap, but this, as they officials admit, is a short-term fix, and the intersection will need to be revisited post-Central Corridor.

David Levinson

Network Reliability in Practice

Evolving Transportation Networks

Place and Plexus

The Transportation Experience

Access to Destinations

Assessing the Benefits and Costs of Intelligent Transportation Systems

Financing Transportation Networks

View David Levinson's profile on LinkedIn

Subscribe to RSS headline updates from:

About this Entry

This page contains a single entry by David Levinson published on August 26, 2009 9:57 AM.

Interview on High Speed Rail in Sekret Firmy was the previous entry in this blog.

New UK high-speed rail plan unveiled is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Monthly Archives

Pages

Powered by Movable Type 4.31-en