Washington Avenue Bridge to receive $56 million re-decking

From Finance and Commerce Washington Avenue Bridge to receive $56 million re-decking to prepare it for Central Corridor LRT.

A major question remains unanswered. Why is it being kept open to traffic while construction is underway? Construction would be shorter, safer, and probably cheaper if the whole thing were closed. No traffic catastrophe would ensue, as the unexpected closure of the I-35W bridge and the planned closure of Mn36 showed, and it would be a good test of whether it could be permanently shut to auto traffic after Central Corridor opens on Washington Mall.

At least they are designing for 3 car trains, which the rest of the corridor seems not to be, lest the cost effectiveness index somehow slip.

David Levinson

Network Reliability in Practice

Evolving Transportation Networks

Place and Plexus

The Transportation Experience

Access to Destinations

Assessing the Benefits and Costs of Intelligent Transportation Systems

Financing Transportation Networks

View David Levinson's profile on LinkedIn

Subscribe to RSS headline updates from:

About this Entry

This page contains a single entry by David Levinson published on December 17, 2009 1:09 PM.

U.S. System for Tracking Traffic Flow Is Faulted was the previous entry in this blog.

The Infrastructure Show is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Monthly Archives

Pages

Powered by Movable Type 4.31-en