Recently in Construction Category

UMN ICON Solar House PV Panels Hit the Roof

Deadline pressures continue as the University of Minnesota crew members continue to work on the ICON Solar House.

3922939595_9b1b701832.jpg






















University of Minnesota Icon Solar House photovoltaic panel moves into position, installed by Green Circuit.
3923726500_746dafa080.jpg
PV Installer works on the roof of the ICON Solar House.
3922936877_710d01eef4.jpg


Installation of PV panels on roof of ICON Solar House.

UMN ICON Solar House Moves Into the Sun

static_uri=http%3A%2F%2Fblog%2Elib%2Eumn%2Eedu%2Fmt%2Dstatic%2F&data=%2Fblogshow%2Ffavo00134aa6a3ab38cc5%2Fimage%2Etable%2Edat&slideshow=1&ssr=1&autofit=1&show_width=640&show_height=480&background_color=%23FFFFFF&thumbnail_border_thickness=5&thumbnail_border_color=%23FFFFFF&thumbnail_highlight_color=%23993300&thumbnail_alignment=right&thumbnail_width=100&thumbnail_height=100
University of Minnesota's ICON Solar House has moved from the construction site at the ReUse Center to it's sunny location on the St. Paul campus.  A flurry of activity continues with work on the systems, decking and cabinet installations. 

Categories

Pages

Powered by Movable Type 4.31-en

About this Archive

This page is an archive of recent entries in the Construction category.

Find recent content on the main index or look in the archives to find all content.