« Film scanner number 1 | Main | Ad*Access »

Coffee shop

Information from the building facilities manager:

Construction preparation for the Wilson Library Coffee Shop will start Tuesday, 11/21 with anticipated construction completion in 10+ weeks.

The Coffee Shop itself and the patron table seating will be between the two marble pillars back to the west marble wall. Counter high seating with electrical outlets for laptops will be built along the south wall where the public telephone booth configuration currently is and along the west wall leading into the Periodicals/Reserve area. Table height counter w/seating and electrical for laptops will be added to the center area between the entrance doors to the Periodicals/Reserve area.

The project calls for floor core drilling and there may be some other extremely noisy work necessary. As much as possible this work will be done between 6 am - 9 am BUT this may not always be possible.

A rough lay out of the coffee shop is posted on the on the marble pillars --- across from the artificial plants.

Jerrie

Post a comment

The views and opinions expressed in this page are strictly those of the page author. The contents of this page have not been reviewed or approved by the University of Minnesota.